![Premier Mounts AM300-B Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/premier-mounts/am300-b/am300-b_installation-manual_1596304005.webp)
Secure the mount to two (2) wall studs with a minimum of four
(4) 5/16" x 3" Hex Lag into the studs.
X
X
Minimum of two (2) 2x4 wood stud to be used
Do not overtighten.
Wood Installation
Two people are recommended for this step; one person to level
the Mount and another person to mark the wall stud location.
Drill a “pilot hole” in the center of the upper right mark using a 1/4" drill
bit and power drill.
Only use a 1/4" drill bit when drilling pilot holes.
X
X
Install a
minimum of four mounting points.
Use a 5/16" washer on each hex lag.
A or B mounting points are a must
. The other two can be in any C locations.
Left-Hand Swingout Arm Orientation
Right-Hand Swingout Arm Orientation
Pivot
Side
Pivot
Side
A
B
A
B
C
C
C
C
B
A
B
A
C
C
C
C
C
C
C
C
1) Place the mount against the wall in the desired viewing location.
2) Adjust the mount to align the mount slots in the wall plate with the
center of the wall studs.
3) Level the mount.
4) Use a pencil to mark the upper right mounting location along the center
of the wall stud.
Installation Guide
AM300-B
www.mounts.com | North America 800.368.9700 | Interna1-714-632-7100
Page 5
1
2
3