2.4
FASTENING THE BRACKET
2.5
INSTALLATION OF THE PIPES
!
!
!
!
!
!
!
!
Drill the holes for anchoring the fastening bracket to the wall using preferably the 6 holes
showed in black on the paper template. If the wall is not sturdy enough it is advisable to use
extra anchor bolts using the holes showed in grey
on the paper template.
The anchor bolts provided require a 8mm holes; the wall should be
inspected to determine if provided bolts are useful or if it is necessary
to use a different anchorage. The manufacturer is not liable in case of
underestimation of the structural consistency of the anchorage made at
the time of installation.
After drilling the holes, the plastic pipes supplied with the air conditioner need to be fitted through them.
The pipe with a diameter of 160mm (hot air discharge) and has to be fitted in the left hole. The length of
the pipes should be 10 mm less than he depht of the wall. Use a normal hacksaw to cut the supplied pipes
to the correct length.
The tube diameter is nearly the same as that carried out using the 165 mm nominal diameter core drill
therefore you may need to slightly force the introduction of the pipe, using in difficult cases, a normal
rubber hammer and a small piece of timber to gently tap the tube into the hole.
Fit the plastic pipe into the hole and fasten the flange with 2x6 mm screws and wall plugs.
Should the insertion prove to be too difficult, we suggest you drill using the core bit inside the hole so as to
widen the internal diameter slightly.
Please use the same instructions to fit the right hand tube (air intake pipe) using the supplied pipe with a
diameter of 150mm.
The tube diameter is slightly smaller than that carried out using the 165 mm nominal
polyurethane f
diameter core drill.
Please centre the pipe into the hole in the wall and insulate and seal its perimeter to prevent air and
humidity infiltration using
oam.
HOT AIR DISCHARGE
THE FLANGE AND THE EXTERNAL
GRATING IS FITTED INSIDE
THE TUBE (160mm)
AIR INTAKE PIPE
THE FLANGE AND THE EXTERNAL
GRATING IS FITTED OUTSIDE
THE TUBE (150mm)
9