2. Reconnect the Strain Gauge (J1) cable connector, then the Data COMM (J3) cable
connector and last the Generator (J5) ,cable connector. Do not cut the Mylar moisture
barrier to connect the Strain Gauge (J1) cable connector.
CAUTION
: Do not cut the Mylar moisture barrier to either remove or install the
strain gauge cable connector. Cutting the barrier will allow sweat and other liquids
to damage the LPCA board.
Contact Precor Customer Support at [email protected] or 800.786.8404 with
any questions.
Page 118
5 Replacement Procedures
LPCA board Replacement