![PP Systems CIRAS-2 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/pp-systems/ciras-2/ciras-2_operators-manual_1592667003.webp)
Table of Contents
CIRAS-2 Operator's Manual Version 2.04
- 1 -
Table of Contents
Installing CIRAS-2 Remote Control Software on your computer ................................ 14
Step 1. Insert 12V NiMH battery packs into main console ........................................ 18
Step 3. Make Leaf Cuvette electrical and gas connections ....................................... 19
CIRAS-2 gas/electrical connection panel
– detailed view .................................................................... 19
Step 4. Connect leaf cuvette power cable to external 12V DC Power Supply .......... 20
Step 5. Inspect absorber columns and water vapor equilibrator ............................... 20
cartridge ...................................................................................... 21
Step 10. Start CIRAS-2 RCS program on your computer ......................................... 24
Familiarizing Yourself with the Measurement Display ............................................. 25
Содержание CIRAS-2
Страница 2: ...This page is left intentionally blank...
Страница 77: ...Observing and Recording Leaf Gas Exchange CIRAS 2 Operator s Manual Version 2 04 75 Time Plot Data Plot...
Страница 112: ...CIRAS CFM Display CIRAS 2 Operator s Manual Version 2 04 110...
Страница 167: ...User Notes CIRAS 2 Operator s Manual Version 2 04 165 User Notes...