INSTALLATION
EATON
Powerware
®
Energy Management System (EMS) Upgrade Kit User’s Guide
S
164201724 Rev 1
www.powerware.com
34
Initial Panel and Breaker Configuration (Using the Display)
NOTE
Use this section only if the optional display is installed.
Configure the panel and breaker data. You can use the following
abbreviated instructions or follow the more detailed steps in Control
Panel Configuration" on page 43.
1.
From the setup screen, enter the Level 1 access password (default
password is L1).
2.
Select
Meters
then
Panel
, highlight the panel to configure, then
select
Config
.
3.
Set the
Reset
value to Yes and select
OK
to clear any breaker
configuration settings for the panel.
4.
Configure the following settings to match the physical panel:
Phases
(always three−phase)
Breakers
(the number of breakers in the panel)
Rating
(the rating in Amps of the main panel breaker)
Panel Layout
(panel numbering style)
5.
Highlight the panel number and select
Schedule
.
6.
Highlight the breaker to configure and select
Config
.
7.
Configure the following settings to match the physical breaker:
Phases
(number of phases for the breaker)
Rating
(breaker rating in Amps)
Warning
(alarm warning level in %)
Overload
(alarm overload level in %)
CT
(the CT ratio – specify 71.9)
8.
Configure each installed breaker in the panel.
9.
If a second panel is installed, repeat the panel and breaker
configuration for the second panel.
10.
Activate the reset switch on the bottom of the electronics module:
hold the switch for 10 seconds or until the display (if installed) turns
off, then release the switch.
Содержание 208/120V
Страница 1: ...Powerware Energy Management System EMS Upgrade Kit 208 120V 380 220V 400 230V 415 240V User s Guide...
Страница 4: ......
Страница 71: ......
Страница 72: ...1642017241 164201724 1...