INSTALLATION
EATON
Powerware
®
Energy Management System (EMS) Upgrade Kit User’s Guide
S
164201724 Rev 1
www.powerware.com
17
Figure 7. Panel Detail (EMS−UGK−LV Model with Dual Panel Option Shown)
NOTE
Single Panel option only.
Connections for CT1, CT2, CTM, and V2 on
Input 2 / Panel 2 are covered with hole plugs.
Содержание 208/120V
Страница 1: ...Powerware Energy Management System EMS Upgrade Kit 208 120V 380 220V 400 230V 415 240V User s Guide...
Страница 4: ......
Страница 71: ......
Страница 72: ...1642017241 164201724 1...