OPERATOR INSTALLATION:
Note:
Remove operator top cover and chain guard for access. If gate extension is required, do so before
installing operator (See Fig. 2).
Note:
Operators are shipped from factory "slide right to open". For slide left to open, remove idler brace,
turn idler brace upside down, and reinstall using upper hole pattern (See Fig. 4).
INSTALLATION LAYOUT
:
1. Layout mounting post and electrical conduit locations (See Fig. 2 & 3).
2. Excavate required area for conduit installation and cementing of mounting posts (minimum of 2’ deep).
3. Set mounting posts and electrical conduits in place.
4. Pour cement to secure mounting posts and let cure for two days prior to operator installation.
Note: Distance between mounting posts and relative location to gate is very important. Operator must be
installed parallel to gate.
1. Mount operator on posts with U-bolts, mounting angles, mounting plates and hardware provided (See
Fig. 3)
2. Mount (1) gate bracket at each end of gate as shown (See Fig. 2). Note: Height of gate bracket center
line is to be even with the drive chain exiting operator (See Fig. 3).
3. Tighten two 3/8 inch set screws in gate bracket to prevent bracket from turning.