OPERATOR INSTALLATION:

 

Note:

 Remove operator top cover and chain guard for access. If gate extension is required, do so before 

installing operator (See Fig. 2).  

Note:

 Operators are shipped from factory "slide right to open". For slide left to open, remove idler brace, 

turn idler brace upside down, and reinstall using upper hole pattern (See Fig. 4). 

INSTALLATION LAYOUT

1.  Layout mounting post and electrical conduit locations (See Fig. 2 & 3). 
2.  Excavate required area for conduit installation and cementing of mounting posts (minimum of 2’ deep). 
3.  Set mounting posts and electrical conduits in place. 
4.  Pour cement to secure mounting posts and let cure for two days prior to operator installation. 
Note: Distance between mounting posts and relative location to gate is very important. Operator must be 
installed parallel to gate. 

1.  Mount operator on posts with U-bolts, mounting angles, mounting plates and hardware provided (See 

Fig. 3) 

2.  Mount (1) gate bracket at each end of gate as shown (See Fig. 2). Note: Height of gate bracket center 

line is to be even with the drive chain exiting operator (See Fig. 3). 

3.  Tighten two 3/8 inch set screws in gate bracket to prevent bracket from turning. 

Содержание RSG 2000

Страница 1: ...herewith X Class II Commercial General Access Vehicular Gate Operator A vehicular gate operator or system intended for use in a commercial location or building such as a multifamily housing unit five...

Страница 2: ...er to ensure that the total system is safe for its intended use All secondary entrapment safety devices must be U L recognized to complete the operating system SYSTEM DESIGNER SAFETY INSTRUCTIONS 1 Fa...

Страница 3: ...the automatic controls do not work Locate the push button or key switch and small warning placard within sight of gate in a secured area at least 10 feet or more from the gate and fence to keep users...

Страница 4: ...e sure roller guards have been purchased and installed 7 Your gate system is required to have a primary and a secondary entrapment safety system installed and maintained See page 7 8 8 If your gate cl...

Страница 5: ...caught between the grille and the fence post or fence The potential hazard must be guarded It can be simply done by placing a screen mesh on the gate and fence in the area of the gate The screen must...

Страница 6: ...d cementing of mounting posts minimum of 2 deep 3 Set mounting posts and electrical conduits in place 4 Pour cement to secure mounting posts and let cure for two days prior to operator installation No...

Страница 7: ...ocket See Figs 3 6 8 Pull drive chain though to opposite end of gate cut to correct length and secure to gate bracket using 3 8 inch chain take up bolt as done in steps 4 and 5 Note When pulling drive...

Страница 8: ...ntacts must be NORMALLY OPEN Connect STOP button to terminal 4 Connect COMMON button to terminal 5 Connect OPEN button to terminal 6 Connect CLOSE to terminal 7 PRIMARY OBSTRUCTION SENSING DEVICE Note...

Страница 9: ...te Install photoelectric cell as close to inside of gate as possible Note Photo cells should be installed across gate opening and behind gate See Fig 11 at least 10 inches above ground 1 After sensors...

Страница 10: ...adio s installation manual to determine which wires are for the normally open contacts and which require the 24 VAC power supply TIMER TO CLOSE The operator is equipped with a timer to close option fo...

Страница 11: ...wrong turn off main power and recheck drive chain installation See Fig 4 6 If drive chain is correct consult the factory WARNING UNDER NO CIRCUMSTANCES SHOULD CONTROL STATION WIRING BE ALTERED IF ROTA...

Страница 12: ...ENTRY Open only 1 Connect MO to terminal 3 2 Connect common to terminal 5 DO NOT Connect N O to terminal 6 FIG 6 EXIT LOOP Open only 1 Connect common yellow to terminal 3 2 Connect N O blue to termina...

Страница 13: ...13...

Отзывы: