13
2. Install a mounting pad as shown below, for use
with optional pipe stand available through your
dealer.
Note: Let cement cure for two days before proceeding.
2"
24" MIN.
1/2" ANCHOR BOLTS
28"
16"
22"
10"
GROUND LEVEL
1-1/2" MIN.
14
INSTALLATION OF POWER HEAD
1. Remove exterior cover and install (2) 2” U-bolts as shown
below.
2. Install 3/8 flat washers, 3/8 lock washers, and 3/8 nuts.
3. Mount power head on top of pipe by inserting pipe up
through large hole in bottom of operator frame, through
the two u-bolts until it stops against drive frame angle.
2" U-BOLTS
(4) 3/8" NUTS
(4) 3/8"
LOCK WASHERS
(4) 3/8"
FLAT WASHERS
DRIVE FRAME
ANGLE
2" PIPE
NOTE: REDUCER AND MOTOR
NOT SHOWN FOR CLARITY.
EXTERIOR
COVER
POWER HEAD