11
I
NSTALLATION INSTRUCTIONS
WARNING: DO NOT APPLY POWER UNTIL TOLD TO DO
SO! RISK OF ELECTRICAL SHOCK OR INJURY MAY
RESULT!
BEFORE INSTALLING OPERATOR
I
MPORTANT:
1. Operator should always be mounted inside the gate.
2. All controls are to be mounted at least 10’ from the
gate arm.
10 FEET
2
FEET
3. Allow at least 2 feet clearance from rigid objects to
gate arm.
12
INSTALLATION OF MOUNTING PIPE
N o t e :
T h e r e a r e t w o o p t i o n s f o r t h e
i n s t a l l a t i o n o f a m o u n t i n g p i p e .
1. Cement a 69” long, 1-1/2 inch pipe
(approximately 2” diameter) in the ground as
shown below.
4" MIN.
33"
36"
2 FOOT DIA.
2" DIA. PIPE
ELECTRICAL SUPPLY PIPE
(PER LOCAL CODE)
NOTE: A SEPARATE CONDUIT
SHOULD BE USED FOR
CONTROL WIRING.
Ground
Level
Note: Let cement cure for two days before proceeding.