MAINTENANCE PROCEDURES
13
MAINTENANCE FREQUENCY TABLE
Item
Daily
Monthly
6 Months
12 Months
Batteries/Connections
Oil Level
Visual Inspection
Spirit Level
Castors
Check Mast & Rollers
Change Hydraulic Oil
Motor Gearbox
Cantilever Deck Mechansim
Load sensing Mechanism
Thorough examination (LOLER)
High/Low Speed Drive
Tilt Switch Operation
MAINTENANCE FREQUENCY
Thorough examination must include checking:
All electrical connections, including battery.
All hydraulic connections and cylinder for leaks.
All connections are secure to powerpack.
All control levers and switches to be in good serviceable order.
Handrails are undamaged and secure.
Operation of gate latch.
Basket tray condition.
Mechanical condition of lifting structure and chassis.
Swivel castor condition and security.
Axle and wheels for condition and security.
Condition and operation of spirit level.
Component and battery covers for condition.
Condition of all labelling - all labels are affixed and legible.
Carry out a full operation check and load test.
Check load sensing is working correctly by applying
full safe working load, plus controlled overload.
Cantilever deck slides and operates smoothly, the stop
pads prevent it extending too far and all securing bolts
are in place and tight.
Motor gearboxes/drive wheels for condition and security
of fixing. Drive wheels are not rubbing on panels.
Содержание nano SP
Страница 1: ...Operating and Maintenance Manual www powertowers com...
Страница 22: ...TEST RESULTS NOTES Description Work Carried out Date...
Страница 23: ...ALTERATIONS REPAIRS Description Work Carried out Date...
Страница 24: ...NANO SP UK 12 17 www powertowers com 100 British designed and manufactured...