11.7.
Connections for communications / state signals
Figure 11-11: Internal terminal block ACBOX area
Get a flat screwdriver of the correct
size for the clamp screws (with a tip of
approx. 3.5 mm). Make the following
connections, loosening the screw,
inserting
the
cable/s
and
then
tightening the screw again (maximum
torque 0.5 N/m).
Do not tighten the screws with force
to a torque of more than 0.5N/m to
avoid damaging the clamp.
Figure 11-11 replicates the terminal
block in the ACBOX area.
Chapter §5.2
Figure 5-8
Figure 5-12
The X20 and X27 clamps are dedicated to
the communication connection (Table 11-2).
Clamps from X1 to X6 are dedicated to the
state of the 55kWp modules (Table 11-3).
Clamps X10 and X11 are connections for
switching on / off via an external command
(Table 11-4).
In Figure 11-11, on the left, is also
indicated the composition of a single
clamp (from X1 to X14): as it can be
seen, connections C-F, B-E and A-D
are through connections.
Содержание Aurora PVI-110.0-YY
Страница 109: ...Installation and Operation Manual Page 109 of 156 PVI XXX 0 YY TL Rev 1 0 Figure 15 7 Display of Solar monitoring...
Страница 154: ...Installation and Operation Manual Page 154 of 156 PVI XXX 0 YY TL Rev 1 0 22 DECLARATION OF CONFORMITY...
Страница 155: ...Installation and Operation Manual Page 155 of 156 PVI XXX 0 YY TL Rev 1 0 23 CERTIFICATE OF CONFORMITY...
Страница 156: ...Installation and Operation Manual Page 156 of 156 PVI XXX 0 YY TL Rev 1 0...