Installation and Operation Manual
Page 56 of 156
[PVI-XXX.0-YY(-TL) - Rev:1.0]
•
If the inspection reveals damages, call the
dealer or the authorised dealer. He will
decide whether the equipment should be
returned for repair and provide instructions
in this regard.
•
It is the customer's responsibility to make a
complaint with the forwarding agent. Failure
to follow this procedure can lead to the loss
of assistance under guarantee for any
damages found.
9.2.
Handling and withdrawal of the PVI-XXX.0(-TL) from the packaging
The package with which is delivered every
PVI-XXX.0(-TL) is usually a wooden crate.
NOTICE
The handling of the inverter in the cage
must be done following the instructions in
this manual.
Chapter §9.2.3
9.2.1
Content of the packaging
Each package contains the following
materials
1
:
Material
Qty
PVI-XXX.0
1
Mechanical Parts
2
This Manual
1
Final Test Documents
1
CD (Software)
1
1
There may be differences pursuant to
agreements with the customer.
For the 275kW and 330kW versions
required
with
an
insulation
Transformer, there is a second pallet
containing the Transformer and the
relative wiring.
On customer's demand, there can
be an additional pallet containing
the extractor fan.
Содержание Aurora PVI-110.0-YY
Страница 109: ...Installation and Operation Manual Page 109 of 156 PVI XXX 0 YY TL Rev 1 0 Figure 15 7 Display of Solar monitoring...
Страница 154: ...Installation and Operation Manual Page 154 of 156 PVI XXX 0 YY TL Rev 1 0 22 DECLARATION OF CONFORMITY...
Страница 155: ...Installation and Operation Manual Page 155 of 156 PVI XXX 0 YY TL Rev 1 0 23 CERTIFICATE OF CONFORMITY...
Страница 156: ...Installation and Operation Manual Page 156 of 156 PVI XXX 0 YY TL Rev 1 0...