Installation and Operation Manual
Page 78 of 156
[PVI-XXX.0-YY(-TL) - Rev:1.0]
11.4.
Connection of the AC power cables
Remove,
if
present,
the
front
protection plastic cover placed in front
of the bars, by means of the anchorage
screws.
Connect the AC power cables as
indicated in Figure 11-5 or Figure 11-6.
For the 275kW and 330kW versions,
connect the power cables (supplied)
from the 'ACbox-Transformer to the
front three bars.
NOTICE
Respect the sequence of the phases
indicated on the specific labels
.
WARNING
It is important that the AC cables have a
dielectric strength of at least 1000Vdc
.
After the cable passage it is
important to make sure that the
open grill holes are closed, e.g. by
means of expanded foam. This
operation
guarantees
that
no
animals or dust can get inside.
Figure 11-5: Connection of the AC power
cables (versions with ≥275kW power or
without Transformer)
TRASFORMATORE
Figure 11-6: Connection of the AC power
cables (versions with ≤220kW power)
Содержание Aurora PVI-110.0-YY
Страница 109: ...Installation and Operation Manual Page 109 of 156 PVI XXX 0 YY TL Rev 1 0 Figure 15 7 Display of Solar monitoring...
Страница 154: ...Installation and Operation Manual Page 154 of 156 PVI XXX 0 YY TL Rev 1 0 22 DECLARATION OF CONFORMITY...
Страница 155: ...Installation and Operation Manual Page 155 of 156 PVI XXX 0 YY TL Rev 1 0 23 CERTIFICATE OF CONFORMITY...
Страница 156: ...Installation and Operation Manual Page 156 of 156 PVI XXX 0 YY TL Rev 1 0...