13 - en
en
-
english
photovoltaic inverters
configuRation modes foR the channels in paRallel
Should it be necessary to configure the channels in parallel, follow the following procedure:
Remove the front panel of the inverter
Using the AWG10/12 cables with insulated female fastons, connect the positive terminal of input 1 to a
positive terminal of input 2 (det. [l]). Repeat the connection for the negative terminals (det. [m]).
parallel connection of the input channels
pVi-3.0/3.6/4.2-tl-outd
pVi-5000/6000-tl-outd
pVi-10.0/12.5-tl-outd
Act on the dip-switch identified by the input mode printing and put in on the PAR position (det. [n]).
configuration dip-switch for input channel operation mode.
pVi-3.0/3.6/4.2-tl-outd
pVi-5000/6000-tl-outd
pVi-10.0/12.5-tl-outd
[l]
[m]
[l]
[m]
[m]
[l]
[n]
[n]
[n]
Содержание Aurora PVI-10.0-TL-OUTD
Страница 31: ......
Страница 64: ...Photovoltaic Inverters APPENDIX B Cable wiring diagram for RS485 line...
Страница 69: ...Photovoltaic Inverters...