Reference: 38741
Issue date: 2018-JUL-24
Revision: L
Page 2 of 37
3. Rigging of the Steel Wires at the Nacelle ............................................ 4
4. Assembly of the BAP 360° .................................................................... 5
5. Overview of Assembled Platform ...................................................... 21
6. Operation of the Blade Access Platform ........................................... 23
7. Instructions & Precautions Before Starting and During Operation . 25
8. Hoist Specifications and Features ..................................................... 28
9. Reeving of Steel Wires ....................................................................... 29
13. Steel Wire Specs and Inspection Criteria ........................................ 35
14. General Caution And Precautions ................................................... 36
Manufacturer:
Power Climber Wind b.v.b.a,
Satenrozen 7,
B-2550
Kontich BELGIUM
Phone: +32-3-451 05 00
Fax ; +32-3-451 05 01
Email: [email protected]
Содержание BAP 360
Страница 12: ...Reference 38741 Issue date 2018 JUL 24 Revision L Page 12 of 37 Mount the support with the winch ...
Страница 21: ...Reference 38741 Issue date 2018 JUL 24 Revision L Page 21 of 37 5 Overview of Assembled Platform ...
Страница 22: ...Reference 38741 Issue date 2018 JUL 24 Revision L Page 22 of 37 GENERAL DIMENSIONS ...