Reference: 38741
Issue date: 2018-JUL-24
Revision: L
Page 18 of 37
D. Assembly of the subframe
Assemble the subframe on the platform that you get the result as in the general
overview. (see point 5) Depending on the size you want to build you will need different
tubes. See the bill of material in point 4a for the needed materials. Use the following
assembly guides to complete the subframe assembly.
Assemble the straight tubes together with the straight connection pieces and the
corner pieces to a straight tube and a cross tube by means of bolts M12x70.
Mount the tower roller assembly to the front tube using the connection plate, 4
spacers, 4 M12x90 bolts and M12 washers and nylock nuts.
Use the following tightening sequence and torque specifications.
Make sure that the rollers are perpendicular to the turbine
’s tower.
Содержание BAP 360
Страница 12: ...Reference 38741 Issue date 2018 JUL 24 Revision L Page 12 of 37 Mount the support with the winch ...
Страница 21: ...Reference 38741 Issue date 2018 JUL 24 Revision L Page 21 of 37 5 Overview of Assembled Platform ...
Страница 22: ...Reference 38741 Issue date 2018 JUL 24 Revision L Page 22 of 37 GENERAL DIMENSIONS ...