![Potterton Puma Flowsure+ Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/potterton/puma-flowsure/puma-flowsure_installation-and-service-instructions-manual_1583139025.webp)
Part No. 27/20334
Commissioning 25
Commissioning - Page 25
3.10
Refit the White Front Case.
a)
Re-fit the right hand side boiler panel to the right hand side of
the tank frame.
b)
Re-fit the left hand side boiler panel to the left hand side of the
boiler.
c)
Secure the base plate to the boiler using the two screws
provided.
d)
Fit the bottom cover to the tank using the two screws
provided.
e)
The front panels for the boiler can now be fitted.
3.11
Handing Over to the User
After completion of installation and commissioning of the system,
the installer should hand over to the Householder by the following
actions:
a)
Explain to the Householder where to find the User's Guide and
his/her responsibilities under the 'Gas Safety (Installation and
Use) Regulations 1994'.
b)
Explain and demonstrate the lighting and shutting down
procedures.
c)
Demonstrate the operation of the boiler including the use and
adjustment of all system controls. This then ensures the
greatest possible fuel economy consistent with household
requirements of both heating and hot water consumption.
Advise the User of the precautions necessary to prevent
damage to the system, and to the building, in the event of the
system remaining inoperative during frost conditions.
d)
Explain the function and the use of the boiler switch, central
heating switch and Reset button.
e)
Explain and demonstrate the function of time and temperature
controls, external frost thermostat (if fitted) and radiator valves,
etc. for the economic use of the system. Ensure the user
understands, that during the summer when central heating is
not required, that the CH switch is set to off.
f)
If a Time Control is fitted (internal or external), then draw
attention to the timer 'User Instructions' and hand them to the
householder.
g)
Stress the importance of regular servicing by a qualified
Heating Engineer and that a comprehensive service should be
carried out AT LEAST ONCE A YEAR.
Содержание Puma Flowsure+
Страница 5: ...Part No 27 20334 Introduction 5 Introduction Page 5 ...
Страница 28: ...28 Routine Maintenance Part No 27 20334 Routine Maintenance Page 28 ...
Страница 30: ...30 Routine Maintenance Part No 27 20334 Routine Maintenance Page 30 ...
Страница 34: ...34 Component Replacement Part No 27 20334 Component Replacement Page 34 ...
Страница 42: ...42 Control Flow Sequence Part No 27 20334 8 Control Flow Sequence Page 42 ...
Страница 43: ...Part No 27 20334 Functional Flow 43 9 Functional Flow Page 43 ...
Страница 44: ...44 Pictorial Wiring Diagram Part No 27 20334 10 Pictorial Wiring Diagram Page 44 ...
Страница 45: ...Part No 27 20334 Electrical Diagram 45 11 Electrical Diagram Page 45 ...
Страница 47: ...Part No 27 20334 Short List of Spares 47 Short List of Spares Page 47 Back page ...