30
10.0 Commissioning
© Baxi Heating UK Ltd 2016
10.2
Checking the Combustion - ‘Chimney Sweep’
Function
1. To set the boiler to operate at MAXIMUM and MINIMUM,
press & together and hold for at least 6
seconds.
‘On’
will be displayed briefly, followed by
‘304’
then
the boiler output expressed as percentage i.e.
‘100’
.
2. Press until
‘00’
is displayed, indicating minimum
input.
3. To exit the function press & together for 6
seconds.
4. The combustion (CO level and CO/CO2 ration) must be
measured and recorded at MAXIMUM DHW input and
MINIMUM input.
5. Follow the flow chart on the next page to comply with the
requirement to check combustion on commissioning.
6. The system MUST be cold to ensure the boiler is operating
under full demand
Fig. 39a
Plug
Analyser Probe
Flue Sampling
Point
Содержание Promax 24 Combi ErP
Страница 56: ...56 Baxi Heating UK Ltd 2016 19 0 Notes ...
Страница 57: ...57 Baxi Heating UK Ltd 2016 19 0 Notes ...