![Potterton Promax 24 Combi ErP Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/potterton/promax-24-combi-erp/promax-24-combi-erp_installation-and-service-manual_1583123037.webp)
37
13.0 Changing Components
© Baxi Heating UK Ltd 2016
13.4
Burner (Fig. 52)
1. Undo the securing screw and remove the airbox,
disengaging it from the fan venturi. Remove the clip securing
the gas feed pipe to the air/gas venturi and disconnect the
fan electrical plugs.
2. Undo the screws securing the air/gas collector to the
extension piece. Note its position and r emove the
extension piece (where fitted) from the cover.
3. Undo the screws securing the burner. Withdraw the
burner from the cover and replace with the new one.
4. Examine the gasket(s), replacing if necessary. Note that
the gaskets are not the same !
5. After changing the burner check the combustion - see
Section 14.1.
13.5
Insulation (Fig. 53)
1. Remove the clip securing the gas feed pipe to the air/gas
venturi and disconnect the fan electrical plugs.
2. Remove the electrodes as described in section 13.1.
3. Undo the nuts holding the cover to the heat exchanger.
Draw the air/gas collector, fan and cover assembly away.
4. Remove the cover insulation piece.
5. Fit the new insulation carefully over the burner and align
it with the slots for the electrodes.
6. If the rear insulation requires replacement, remove it and
all debris from the heat exchanger. Also it may be necessary
to separately remove the spring clip from the pin in the
centre of the heat exchanger and the ‘L’ shaped clips
embedded in the insulation.
7. Do not remove the shrink-wrapped coating from the
replacement rear insulation. Keep the insulation vertical and
press firmly into position.
8. Examine the cover seal and replace if necessary.
Reassemble in reverse order.
Fig. 52
Cover
Burner
Gasket
Extension Piece
(24 & 28 only)
Air/Gas
Collector
Heat
Exchanger
Rear
Insulation
Cover
Insulation
Seal
Air/Gas
Collector
Electrode
Leads
Fig. 53
Control Box removed
for clarity
Gasket
Spark Ignition
Electrode
Flame Sensing
Electrode
Содержание Promax 24 Combi ErP
Страница 56: ...56 Baxi Heating UK Ltd 2016 19 0 Notes ...
Страница 57: ...57 Baxi Heating UK Ltd 2016 19 0 Notes ...