
19
INSTALLATION INSTRUCTIONS - Page 19
Figure 22 WIRING THE BOILER FOR
COMBINED GRAVITY HOTWATER/PUMPED
CENTRAL HEATING SYSTEM
Route a three core cable through the plastic bush in the
rear of the control box and the cable clamp as illustrated in
Fig 22. Connect the cable to the boiler input terminals as
follows:-
Switched live on the GRAVITY DHW control
circuit to terminal marked MAINS ‘SwL’ Neutral to terminal
marked MAINS ‘N’ Earth to terminal marked MAINS
Secure the cable within the clamp by tightening the two
securing screws.
The pump should be connected to PUMPED CENTRAL
HEATING control circuit at the junction box. See Fig 19.
Figure 23 FUNCTIONAL FLOW DIAGRAM
Figure 24 BOILER WIRING DIAGRAM
Figure 24A FITTING SIDE
INFILL PANELS
If required, the gap between
the casing sides and rear
wall can be closed off using
the infill panels supplied.
Ensure the casing surface is
FULLY CLEAN AND DRY.
Remove the protective
backing paper
from the adhesive strip on
the infill panel, carefully
align and press into place,
applying FIRM EVEN
pressure down the FULL
LENGTH of contact area
between panel and case. If
conditions are near
freezing, the boiler case
should be warmed prior to
application of the infill panel.