
16
INSTALLATION INSTRUCTIONS - Page 16
Figure 13 SEALING AIR TUBE TO AIR BOX
Figure 14 ASSEMBLING INNER FLUE
PRODUCT TUBE AND FLUEHOOD
Pass Inner Flue Product Tube through hole in rear of boiler
and secure using two 5mm screws from accessory pack C.
Refit fluehood.
Working from outside the building, slide the plain end of the
Air Tube into Air Box leaving the tabs on the Air Tube flush
with outside wall face. Using the adhesive tape from
accessory pack D seal joint between Air Tube and Air Box.
Make good outside wall surface.
Figure 15 ASSEMBLING TERMINAL
Figure 16 SECURING TERMINAL
Engage the four self-tapping screws from accessory pack E
into the pre-drilled holes in the end of the Outer Flue
Product Tube as illustrated but do not fully tighten.
NOTE: these screw positions are not symmetrical to ensure
correct assembly with the Terminal.
Slide Terminal on to the Outer Flue Product Tube,
engaging fully, the slots in the Terminal under the heads of
the four screws in the Outer Flue Product Tube. Secure
terminal by tightening the four screws.
Slide the Terminal Assembly into the Air Duct engaging the
Outer Flue Product Tube over the Inner Flue Product Tube.
Push Terminal back until the Terminal flange touches the
wall. Mark the position of the two Terminal fixing holes
(which also pass through the holes in the Air Tube Tabs)
on the wall.
Temporarily remove Terminal assembly. Drill Terminal
fixing holes using a 5mm drill and insert wall plugs from
accessory pack F into holes.
Refit Terminal assembly and secure using two screws from
accessory pack F. Centrally fit Terminal Guard over
Terminal if applicable using suitable screws and wall plugs.