![Potterton Kingfisher Mf CFL40 - 100 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/potterton/kingfisher-mf-cfl40-100/kingfisher-mf-cfl40-100_installation-and-service-instructions-manual_1583053006.webp)
Publication No. 5102977
6
Installation Requirements
1. Installation Requirements
1.1
Gas Supply
The meter and supply pipes must be capable of delivering
this quantity of gas in addition to the demand from any other
appliances in the house and must be governed at the
meter.
On 90 & 100 models, due to the gas flow rate required,
22mm gas supply pipe should be used up to the inlet
connection of the gas cock on the boiler.
The complete installation must be tested for gas soundness
and purged as described in BS6891.
1.2
Electricity Supply
230V ~ 50Hz via a fused double pole switch with a contact
separation of at least 3 mm in both poles adjacent to the
boiler. Power consumption is approximately 80W. There
must be only one common isolator for the boiler and its
control system and it must provide complete electrical
isolation. A plug (if fitted) must be accessible to the user
after installation of the appliance.
Fuse the supply at 3 A. The minimum requirement for the
power supply cable is that it should be a PVC sheathed
cord at least 0.75 mm² (24 x 0.2 mm) (code designation
HO5 VV-F or HO5 VVH2-F) as specified in table 16 of
BS6500:1984.
All wiring external to the boiler shall comply with the latest
IEE Wiring Regulations, and any local regulations which
apply.
WARNING: THIS APPLIANCE MUST BE EARTHED.
In the event of an electrical fault after installation of the
boiler, preliminary electrical systems checks must be
carried out i.e. Earth Continuity, Short Circuit, Polarity and
Resistance to Earth.
1.3
Location of Boiler
The boiler is not suitable for external installation. The boiler
must stand firm and level. No special floor protection is
needed, but finishes which soften when warm e.g. linoleum
and plastic floor tiles should be removed or may be
protected by an insulating sheet at least 10mm thick.
The boiler must be installed so that the flue terminal is
exposed to the external air. It is important that the position
of the terminal allows the free passage of air across it at all
times.
The boiler is suitable for installation against a combustible
wall e.g. wood cladding, provided that the flue duct is not
closer than 25 mm to combustible material. A metal sleeve
should be installed to surround the flue duct to provide a
25mm annular space. Further guidance is given in
BS5440:1:2000, sub-clause 4.4.
If the boiler is to be installed in a timber framed building
it should be fitted in accordance with the Institute of Gas
Engineers document IGE/UP/7/1998 (also, British Gas
Service publication Part 19 - Building and Kitchen Work).
If in doubt advice must be sought from Potterton.
RSL boilers may be installed in any room, although particular
attention is drawn to the requirements of the current IEE
Wiring Regulations and, in Scotland, the electrical provisions
of the Building Standards applicable in Scotland with
respect to the installation of the boiler in a room containing
a bath or shower.
CFL boilers must not be installed in bath, shower rooms, or
rooms used as sleeping accommodation.
RSL Models: Where a room-sealed appliance is installed in
a room containing a bath or shower, any electrical switch
or appliance control, utilising mains electricity should be so
situated that it cannot be touched by a person using the
bath or shower.
CFL Models: Conventional flue boilers can be installed
either in a kitchen or utility room or inside a suitably
ventilated, purpose designed or modified compartment.
Where the installation of the boiler will be in an unusual
position, special procedures may be necessary and BS6798
and BS5546 give detailed guidance on this aspect.
A compartment used to enclose the boiler must be designed
and constructed specifically for this purpose. An existing
compartment may be used provided that it is modified for
the purpose. Details of essential features of compartment
design including airing cupboard installations are given in
BS6798 and BS5546 and should be complied with.
RSL Models: If the boiler is fitted under a worksurface it may
be located next to or between kitchen cabinets or fittings
providing that the front of the boiler case is visible and
unobstructed, the special requirements for an enclosed
compartment will not apply
If the boiler is to be fitted under a worksurface, the
worksurface may need to be removed to install the boiler.
It is advisable that the worksurface be removable to allow
access for servicing if required.
If the boiler is to be fitted in a run of kitchen units it is
recommended that the boiler is fitted first or the adjacent
units removed.
Содержание Kingfisher Mf CFL40 - 100
Страница 13: ...Publication No 5102977 13 CON0093B Installation Requirements Fig 8 Fig 7 ...
Страница 14: ...Publication No 5102977 14 Installation Requirements Fig 9 Fig 10 ...
Страница 30: ...Publication No 5102977 30 5 Wiring Diagrams Functional Wiring Diagram Fig 29 Air Pressure Switch CON0089A ...
Страница 31: ...Publication No 5102977 31 Fig 30 Pictorial Wiring Diagram CON0082B T T B CFL Models Only ...
Страница 34: ...Publication No 5102977 34 Fault Finding ...
Страница 35: ...Publication No 5102977 35 Fault Finding ...