Publication No. 5102977
15
2. Installation
2.1
Install the boiler
These instructions assume you have decided
on where the boiler will be located and the type
of flue system to be used.
1. Carefully unpack the boiler. Remove and
place aside the tailpipe/gravity stat kit and
on CFL boilers, the ancillary bag containing
the top and rear blanking plates with seal
and control panel.
2. Do not discard any packaging until all the
items are accounted for.
3. Temporarily position the boiler to ensure
where required, the top cover touches the
wall. This sets the minimum rear clearance
for the pipework. Mark the position on the
floor.
4. Remove the plinth - 2 screws.
5. Remove the front door - 2 screws, unhook
and lift off.
6. Remove the controls panel - open flap,
remove screw, unhook, disconnect the in-
line connector and lift away.
7. Remove the top cover - 2 screws, pull
forward and lift off.
Installation
Fig. 12
2.2
Install the flue
Install the flue type as required.
Conventional Flue:
1. Loosen the 4 screws securing the flue spigot
to the boiler, line the spigot up with the flue
and fully tighten the screws.
Note: From its fully rearward position the
spigot will move forward 50mm.
CON0021F
Fig. 11
Содержание Kingfisher Mf CFL40 - 100
Страница 13: ...Publication No 5102977 13 CON0093B Installation Requirements Fig 8 Fig 7 ...
Страница 14: ...Publication No 5102977 14 Installation Requirements Fig 9 Fig 10 ...
Страница 30: ...Publication No 5102977 30 5 Wiring Diagrams Functional Wiring Diagram Fig 29 Air Pressure Switch CON0089A ...
Страница 31: ...Publication No 5102977 31 Fig 30 Pictorial Wiring Diagram CON0082B T T B CFL Models Only ...
Страница 34: ...Publication No 5102977 34 Fault Finding ...
Страница 35: ...Publication No 5102977 35 Fault Finding ...