UNPACKING
The appliance is delivered assembled and
protected by a plastic bag, inside a strong
wooden crate. The packaging is designed
to be handled by a forklift or pallet truck.
The complete crated appliance can go
through a door of 2,320mm high. Without
packaging it can go through a door
1,970mm
high.
Remove nails
fi
xing crate sides to the base. Re-
move nails from one end of the crate. Remove end
of crate and slide the main body of the crate off the
opposite end.
Remove plastic wrapping once the appliance has
reached its intended installation area.
Dispose of plastic packaging carefully.
Keep out of the reach of children and
animals.
APPLIANCE LOCATION
The location selected for installation of the appli-
ance must allow the provision of a satisfactory
fl
ue,
an adequate air supply (for type B
23
), a drain and
be well illuminated. A purpose built plant room or
compartment is strongly recommended.
If a purpose built plant room is not available, meas-
ures should be taken to protect the appliance from
damage and prevent any extraneous matter from
being stored on or around the Heater. See BS 6644
Clauses 4, 5 and 6 for details. Any combustible ma-
terial adjacent to the appliance must be so placed
and shielded as to ensure that it’s temperature
does not exceed 66ºC (150ºF).
There must be easy access to the plant room and
boiler at all times. The appliance must be located in
an area where leakage from the tank, water con-
nections or the combined temperature and pres-
sure safety valve will not result in damage to the
area adjacent to it. When such locations cannot
be avoided, a suitable drain tray must be installed
under the Heater. The drain tray must be no deeper
than 38mm and must be 100mm wider and longer
than the boiler. It should be piped to an adequate
drain using 20mm (0.75in) diameter pipe, angled
for proper drainage.
Access must be provided to the front of the boiler
with adequate clearance for servicing and opera-
tion. (
Fig 1.1
)
The
fl
oor on which the boiler is installed must be
fl
at, level and of suf
fi
cient strength to withstand the
weight of it when
fi
lled with water, and should satisfy
the requirements of the Local Authority & Building
Regulations.
Whether connecting to an existing or a new
heating system, a
fi
lter/strainer (with two
isolation valves) must be
fi
tted in the return
pipe. When necessary it can be removed
and cleaned, which will help protect the
appliance from contaminants, from within the
heating system.
A
PPLIANCE
FLOOR
FIXING
KIT
This appliance has been supplied with plates to fas-
ten the appliance securely to the
fl
oor.
There are four
fl
oor
fi
xing plates (M6644) included
with this unit. Two have been packed separately with
the Air Duct kit that includes these instructions and
another two plates have been used to fasten the
appliance to the pallet.
Central Floor
fi
xing method (two plates required)
Once the appliance has been located on a level sur-
face,
fi
x the appliance to the
fl
oor using the following
method.
1) Slide plate into position so that it interlocks onto
the LH central base support . Mark
fl
oor
with hole position and remove plate (
Fig 2.1)
.
2) Drill marked position on
fl
oor to allow installers
preferred method of
fi
xing.
3) Re
fi
t plate and fasten through using preferred
fi
xing method.
4) Repeat method at the RH end of the central
base
support.
Fig 2.1
Содержание iHE 100/300
Страница 1: ...M6500 M6500 ...
Страница 21: ...iHE 19 Fig 4 3 WIRING DIAGRAM PCB 1 ...
Страница 22: ...iHE 20 WIRING DIAGRAM PCB 2 3 Fig 4 4 ...
Страница 34: ...iHE 32 APPLIANCE COMPONENTS Fig 7 1 21 20 17 22 19 18 16 24 25 26 27 28 29 23 ...
Страница 35: ...iHE 33 APPLIANCE COMPONENTS Fig 7 2 2 3 5 4 6 14 13 12 7 11 8 10 1 15 9 31 32 34 35 36 30 37 33 ...
Страница 39: ...NOTES ...
Страница 40: ...Publication Date 01 09 12 ...