iHE
27
SERVICING
Health and Safety Statement :
This Boiler contains no asbestos.
In all cases, before work commences turn
off the Mains Electricity and Gas Supply.
R
OUTINE
S
ERVICE
To ensure continued ef
fi
cient operation of the Boiler
it is recommended that it is checked and serviced at
regular intervals.
The frequency of servicing will depend upon the
particular installation and usage but in every case
a maximum of twelve months should be allowed
between service inspections.
It is law that any service work should be carried
out by Registered personnel.
1.
Clean the burner and check the combustion
chamber.
2.
Check condition of ignition spark and sensing
electrodes.
3
.
Check the air duct and
fl
ue seals.
4.
Check condensate syphon and pipework for
leaks.
5
.
Check the combustion CO, CO
2
and gas rate.
Follow the procedures given in Changing Components
for parts removal in addition to the following notes.
B
URNER
& C
OMBUSTION
C
HAMBER
To view the burner and the inside of the heat
exchanger it is suggested you remove the front of
the heat exchanger complete with the fan and gas
valve:
•
Remove door and swing aside the controls
Panel.
•
Disconnect the gas cock
fl
ange from the gas
valve.
•
Unplug fan electrical connectors.
•
Remove Air tube from the main air stack or by
removing the spring clip (Fig 6.1) and pulling off
the
fl
exible hose. Do not remove the two black
screws holding the air valve in place.
•
Remove the connection plug and earth lead to
the spark generator.
•
Pull off the earth lead connection on the
gas valve and heat exchanger.
•
Undo the four nuts holding the heat exchanger
front and pull the whole assembly forwards.
•
Replace silicone door seal if there are any
signs of damage and in any case every 2 years.
•
Heat exchanger deposits can be removed using
a non-metalic brush and vacuum cleaner.
•
Assembly is the reverse.
SERVICING
S
PARK
E
LECTRODE
OR
S
ENSE
E
LECTRODE
•
Turn off the Boiler.
•
Pull off the Lead(s).
•
Undo the two screws retaining the electrode
assembly and carefully withdraw.
•
The spark gap should be 3.0 mm ± 0.5. There is
a useful guage built into the burner door (Fig 6.1)
•
Assembly is the reverse, ensure the gasket
is correctly placed.
Fig 6.1
Spark gB
Spark gap guage
A
IR
D
UCT
& F
LUE
S
EALS
A visual inspection should establish there are no leaks
around any of the seals, including the
fl
exible Air Duct
to the Venturi. Replace if there is any doubt as to the
integrity of the seals.
C
ONDENSATE
P
IPEWORK
Inspect all joints in the pipework for leaks, repair/re-
place parts if any defects found.
C
ONDENSATE
S
YPHON
The lower bowl of the Syphon can be unscrewed,
examined and cleaned. Check its connection to the
Heat Exchanger and pipework for leaks.
G
AS
R
ATE
& C
OMBUSTION
See the Datatable on the inside of the cover for the
correct values. A Combustion sample point is provided
on the individual
fl
ue outlet elbows.
To check, re-establish gas and electricity and then
run the Boiler for at least 5 minutes. If adjustment is
required remove the cover over the Throttle screw
and turn anti-clockwise to increase CO
2
, clockwise to
decrease.(
Fig. 6.2
) Allow at least a minute between
adjustments to obtain stable readings. The Gas Rate
will be correct when the CO and CO
2
fi
gures are to
speci
fi
cation.
Fig 6.2
Throttle Screw
Adjustment
Air hose securing
clip
Содержание iHE 100/300
Страница 1: ...M6500 M6500 ...
Страница 21: ...iHE 19 Fig 4 3 WIRING DIAGRAM PCB 1 ...
Страница 22: ...iHE 20 WIRING DIAGRAM PCB 2 3 Fig 4 4 ...
Страница 34: ...iHE 32 APPLIANCE COMPONENTS Fig 7 1 21 20 17 22 19 18 16 24 25 26 27 28 29 23 ...
Страница 35: ...iHE 33 APPLIANCE COMPONENTS Fig 7 2 2 3 5 4 6 14 13 12 7 11 8 10 1 15 9 31 32 34 35 36 30 37 33 ...
Страница 39: ...NOTES ...
Страница 40: ...Publication Date 01 09 12 ...