Before you begin to install the iDig, make sure you’ve got everything you need to
successfully complete the installation along with checking your equipment and your
working area.
Prestart Checklist #1 -
Items to have on hand to assist with installation
•
Tape measure
•
Magnetic plumb bob
•
Clean rags
•
Brake cleaner
•
Window cleaner
•
Flat Top Tripod
•
An extra set of poles to raise the laser pointer higher for larger excavators
•
Rotating laser
•
Cable ties, conduit and sticky cable mounts for a tidy cab
Prestart Checklist #2 –
Machine Checks
Have you got a Safe and Suitable location for the install?
This calibration process requires a bit of space to operate the machine in, you’ll be rotating the cab 360
degrees and fully extending the boom and bucket. Find an area where you can do this safely. This area will
need to provide stable and level footing for you and the machine. It is crucial that the machine is level left
to right to aid in calibration of boom and dipper. An excavator tipping forward/backward at an angle is
acceptable.
Machine checks before you start:
•
Is the excavator in good working order?
•
Pins and bushes are well greased? A sloppy machine equals a potentially sloppy calibration and an
inaccurate system.
•
No hydraulic problems? Does the boom stay raised and doesn’t drop when left in a high position? If
so, you’ll not be able to calibrate the Boom and Dipper Sensors correctly and the system will not be
accurate.
Check the power outlet
•
Can the machine supply correct voltage?
•
Is the power supply stable and not drop or turn off?
•
If power is not available, check for blown fuse.
Содержание IDIG TOUCH XD610
Страница 1: ...Installation Walkthrough Guide ...
Страница 3: ...Pre Installation Checklists ...
Страница 5: ...Stage 1 Hardware Installation ...
Страница 11: ...Stage 2 Auto Calibration ...