This guide has been put
together for the purpose of
supporting an installation of a
iDig XD610.
This guide will cover the following:
•
Pre-Installation Checks
•
Stage 1 - Hardware Installation
•
Step 1 - “In Cab” Installation of LED
Indicator and C-Box
•
Step 2 - Installatation of 2D Sensor
•
Step 3 - Installation of Mounting
Plates for Boom and Dipper
Sensors
•
Stage 2 - Auto Calibration
•
Step 1 - Machine Set up
•
Step 2 - 2D Sensor (Pitch, Roll and
Yaw)
•
Step 3 - Excavator Setup – Boom
and Dipper Calibration
•
Step 4 - Bucket/Quick-link Sensor
Installation and Calibration
•
Step 5 - Laser Functionality
Содержание IDIG TOUCH XD610
Страница 1: ...Installation Walkthrough Guide ...
Страница 3: ...Pre Installation Checklists ...
Страница 5: ...Stage 1 Hardware Installation ...
Страница 11: ...Stage 2 Auto Calibration ...