12
Issue
5
–
January
2014
Operating Instructions
Once the MiniVap is correctly connected to gas and mains power supplies and a suitable
Needle Head is installed, as described in the previous sections, the unit is ready to be set
up for use.
This involves the following steps:
•
Platform
adjustment
•
Temperature
setting
•
Setting
Inlet
Operating
Pressure
•
Setting
System
Gas
Flow
•
Sample
concentration
using
MiniVap
Turn the power on at the IEC power inlet at the rear of the instrument; the temperature
controller will display the previously set temperature and ambient temperature of the gas
manifold.
Important note:
Ensure that the system gas flow control valve is closed otherwise the
unit will start to heat up and dispense gas prematurely
Moving platform
Needle head
Hand wheel for
raising and lowering
platform
Gas temperature
controller
System gas
flow control
valve
Содержание MiniVap
Страница 1: ...Ins struc ction Manu ual ...