
Tracks
q
All track ends filed. This is extremely important.
q
Cover goes through the track joints smoothly.
q
All track screws are tight and flush.
q
Pulleys are flush against the end of the track.
q
The guides are snug against the track.
q
Guides bolted in and are tight.
q
Are the positive stops installed.
q
Track splices used when joining the tracks together.
Mechanism
q
Mechanism installed level in the box.
q
Roll-up Tube level in cover box.
q
Tube centered between the tracks.
q
Enough clearance top, bottom, sides for the fabric. No rubbing of webbing on sides or bottom of box.
q
Tube at the right height?
q
System mounted at right angle to the track.
q
Ropes coming back straight out of the track. An excessive angle will cause wear on the guides at the end of the track.
q
Ropes are not rubbing on any brackets or the deck.
q
Ropes are run correctly.
q
8 feet of rope left on rope reel.
q
System bonded according to electrical code. Cover bonded to leading edge and roll-up tube.
q
Make sure there is adequate drainage from the cover box.
Cover
q
Fabric pinned to the roll-up tube without pinned folds.
q
Cover runs smoothly.
q
Cover properly aligned when it closes or retracts. Note: An inch or two out of square is not uncommon and is
not a concer
n as it will not eff
ect the operation of the cover. Because of the size of the fabric roll, and changes in
operating conditions the cover may vary slightly in alignment as it is run.
q
The leading edge inserts move in and out freely the whole length of the pool.
q
Cover not rubbing in the cover box as it rolls up.
Cover Lid
q
All sharp edges have been file.
q
All areas where the lid is not flat on the deck been screwed down to eliminate any potential hazards.
q
There is enough clearance between the lid brackets and the cover to avoid rubbing.
Misc.
q
Key switch is in full view of the pool.
q
Cover pump tested by putting it in the water and operate it in front of homeowner.
q
The cover box is clean and clear of debris so that the drains are not easily clogged.
q
Pool area cleaned up.
q
Homeowner has been instructed.
© Latham Pool Products, Inc. 201
9
. All rights reserved.
Installation Checklist
20 of 20
L0405 1/
2
1/1
9
bm