
Version 2.0
35
6_26931B ELS2100_2100 Ice Se rvice Manual_vsn2.0_maste r.doc
Replacing The Mass Flow Controller
When required:
Faulty Mass Flow controller
Tools required:
Allen Keys
Parts required:
Mass-Flow Controller (# 0860-0530)
1) Open the detector’s side panel
using the access key.
2) Unplug the two black gas
lines from either end of the Mass
flow controller.
3) Disconnect the Mass flow
controller cable from the top the
MFC.
4) Remove the four screws,
located underneath the base of
the instrument, to remove the
mass flow controller assembly.
Insert the replacement mass- flow
controller and reconnect the gas
lines and control cable.