![Poly-Tex FC3000 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/poly-tex/fc3000/fc3000_assembly-instructions-manual_1575791030.webp)
Roll Up Tube and Crank Installation
Guide Rope Installation
DETAIL A
DETAIL C
DETAIL B
Side Vent Installation - Part 2
30
AK-210302
30
A
C
NB1809
Self-Drill Screw
CF1014
1
KHR36-20TW
Poly
Start clips 2" from
end of tube
RC1010
Roll-Up Tube Clip
RC1303
U-Joint w/Bolts
RC1319
Roll-Up Crank
2
RC1319
Roll-Up Crank
FT2071
Door "J" Hook
NB1805
Self-Drill Screw
End Frame
6
Trim excess tube
flush with structure
5
RC1406
Nylon Rope
7
B
1.
Join 4X
CF1014
using 1X
NB1809
at each joint.
2
.
Mark the hanging poly 54" below the Wiggle Wire Base
3. Wrap the hanging poly around the roll up tubes
CF1014
and use
RC1010
Clips spaced 36" apart to hold poly
in place, use the marks made to ensure the tube and clips are
parallel with the Wiggle Wire Base
4. Join
HT1085
with
RC1319
using
RC1303
and included hardware.
5.
Trim run of
CF1014
to length of structure.
6.
Install
FT2071
at desired height using 2X
NB1809
.
7.
Thread
RC1406
(Rope) through the first
RC1311
and into
the first
RC1330
. Alternate up and down for the length
of the structure and tie off.
3
Wiggle Wire Base
Mark the poly 54" below the
Wiggle Wire Base.
4