![Poly-Tex FC3000 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/poly-tex/fc3000/fc3000_assembly-instructions-manual_1575791020.webp)
DETAIL A
DETAIL B
DETAIL C
Equipment Rail Installation
20
AK-210302
20
End Frame
Outer Equipment Rail
RR2109
FT1990
NB1809
1" Self-Drill Screws
3X NB1809
1" Self-Drill Screws
FT2119
Intermediate
Frame Truss
Equipment Rail
RR2109
NB1809
1" Self-Drill Screw
Intermediate
Frame Truss
NB1809
1" Self-Drill Screws
FT2117
Center Equipment Rail
RR2109
1
1
3
2
Center Equipment Rail
Outer Equipment Rails
2
Equipment Rails are installed on top of the frame trusses
with the open side of the roll-formed channel up.
1.
Install 2X Outer Equipment Rails using
RR2109
on top
of Intermediate Frame Trusses. Ends will connect to
End Frame verticals with
FT1990
(see Detail A). Trim
Equipment Rail RR2109 as required. Connect
RR2109
Pieces as shown in Detail B.
2.
Install 1x Center Equipment Rail using
RR2109
on top of
Intermediate Frame Trusses. Ends will connect to the
Intermediate Frame Truss using
FT2117
(See Detail C).
Trim Equipment Rail
RR2109
as required. Connect
RR2109
Pieces as shown in Detail B.
3.
Attach equipment rails to Intermediate Frame Trusses
using
FT2119
(See Detail B).