MPS6100-M MAINTENANCE MANUAL
ORIGINAL INSTRUCTIONS
Page 10
CAUTION: The sealing bars are extremely hot when machine is running—be sure to
allow bars to cool to avoid personal injury.
2)
Next, you will need to remove the guarding. The guarding is removed by loosening
the two boltss shown in Figure #6.
3)
After the guarding has been removed the cooling and sealing bar pressure will also
need to be released follow procedure 1.6 and figure 3 for details.
4)
Next the tension on the Teflon bands must be released by turning both tension
knobs shown in figure 4 counterclockwise.
5)
Remove the old bands and clear any band fragments that may be present. This is also
an ideal time to clean the seal bars, refer to section 3.2 for information.
6)
Place the new bands between the heating and cooling bars. This is accomplished by
gently pulling up on the pressure plates shown in Figure #5, then sliding the Teflon
band between the front and the rear sealing/cooling bars.
7)
Slide the bands up the pulleys on both ends and try to centre them on the pulleys
and on the sealing/cooling bars.
8)
Install the components removed in step 3 of this procedure.
FIGURE - 6
Thumb Screw
Socket Head Cap Screw
Содержание MPS6100-M
Страница 9: ...MPS6100 M ORIGINAL Page ix ISO SAFETY SYMBOLS LOCATION...
Страница 10: ...MPS6100 M OPERATION MANUAL ORIGINAL Page x MPS6100 M OPERATION MANUAL...
Страница 32: ...MPS6100 M MAINTENANCE MANUAL ORIGINAL Page xii MPS6100 M MAINTENANCE MANUAL...
Страница 50: ......
Страница 51: ......
Страница 52: ......