MPS6100-M MAINTENANCE MANUAL
ORIGINAL INSTRUCTIONS
Page 3
TIME
(minutes)
TEMPERATURE
(°C)
0
141
2
89
4
62
6
47
8
40
10
35
1.3
OPENING THE CONTROL BOX
The control box must be opened to perform certain maintenance procedures. This
procedure must always be followed in order to reduce the risk of injury to the service
technician.
Tools Required
Number of Persons Needed
1.
METRIC ALLEN KEYS
1
1)
Once the machine has been locked out in a de-energized state it is now safe to
loosen off the two bolts in the lower front corners of the control box as shown in
Figure #1.
2)
The front panel may now be lifted up to access the inside of the control box.
FIGURE - 1
Socket Head Cap
Screws
TABLE - 1
Содержание MPS6100-M
Страница 9: ...MPS6100 M ORIGINAL Page ix ISO SAFETY SYMBOLS LOCATION...
Страница 10: ...MPS6100 M OPERATION MANUAL ORIGINAL Page x MPS6100 M OPERATION MANUAL...
Страница 32: ...MPS6100 M MAINTENANCE MANUAL ORIGINAL Page xii MPS6100 M MAINTENANCE MANUAL...
Страница 50: ......
Страница 51: ......
Страница 52: ......