background image

34

Installation and user guide PLATINUM Inverter 7000 R3, 9000 R3, 11000 R3, 14000 R3, 16000 R3

Menu

Example: Parameter 1007 VoltMon (voltage monitoring)

Parameter 1007

Parameter 1007 

 

with submenus 1007.

0

 and 1007.

1

Parameter 1007

 

with submenus 1007.0 and 1007.0.

0

 

with the current value for 1007.0.

0

6.5.4  MPP-Mode service menu

MPP mode

Default

 

Default MPP mode for free module surface

Shadow mode

 

For systems with shadowing (e.g. through trees), the MPP area is 
frequently subject to complete scans.

 

In MPP Shadow mode, the ideal yield may not be achieved because only 
a little energy is fed in during the MPP search.

Содержание 11000 R3

Страница 1: ...Installation and user guide Inverter 7000 R3 9000 R3 11000 R3 14000 R3 16000 R3 As at 06 2012 Mat no 758 266 AA EN...

Страница 2: ...2 Installation and user guide PLATINUM Inverter 7000 R3 9000 R3 11000 R3 14000 R3 16000 R3...

Страница 3: ...el requirements 7 2 4 General safety instructions 7 3 Installation 8 3 1 Scope of delivery 8 3 2 Unpacking 8 3 3 Assembly 9 3 4 Connection 12 4 Initial operation 19 4 1 Switch on 19 4 2 Initial operat...

Страница 4: ...00 R3 9000 R3 11000 R3 14000 R3 16000 R3 7 Maintenance and cleaning 36 7 1 Maintenance 36 7 2 Cleaning 36 8 Errors and troubleshooting 37 8 1 Error display 37 8 2 Event list 39 9 Technical data 42 10...

Страница 5: ...power reduction via an external monitoring device 1 2 About this guide This installation and user guide explains how to install and operate PLATINUM inverters of type 7000 R3 MDX 9000 R3 MDX 11000 R3...

Страница 6: ...e Consequences of non observance DANGER Imminent danger Death serious injury WARNING Potential danger Death serious injury CAUTION Potential danger Minor injury CAUTION Potential danger Damage to prop...

Страница 7: ...requirements The inverter may only be installed and put into operation in accordance with this installation and user guide by trained specialist personnel for example Service partners authorised by Di...

Страница 8: ...Inverter Wall bracket Brief guide 3 2 Unpacking CAUTION The inverter weighs 45 kg f f Get another person to help you unpack it f f Wear safety shoes when unpacking f f Ensure that you have firm and s...

Страница 9: ...1 Safety instructions WARNING Injury may result if the inverter falls f f Use fixing materials suited to the assembly wall and the weight of the inverter f f Get a second person to help with assembly...

Страница 10: ...0 R3 11000 R3 14000 R3 16000 R3 Installation 150 150 400 500 626 208 238 5 489 1037 327 547 Dimensions in mm 1 Choose the assembly location taking into account dimensions and distances 2 Fix the wall...

Страница 11: ...3 4 4 3 Loosen but do not remove the safety screws on the sides 3 4 Hang up the inverter 4 starting from the bottom and moving upwards by slotting it into the wall bracket 5 Ensure that the inverter...

Страница 12: ...forwards on the side of the handle recess 3 4 2 Connect the AC voltage DANGER Risk of death due to high AC voltage f f Switch off the mains voltage supply AC side before connecting the inverter safety...

Страница 13: ...installation situation Min cross section 4 mm2 Max cross section 16 mm2 1 Secure the three phase AC voltage connection lines accordingly see Technical data on page 42 2 Strip 18 mm of insulation from...

Страница 14: ...the sun shines voltage is applied to the PV modules f f Before connecting the inverter check whether voltage is applied to the generator s DC voltage connection f f Before connecting the inverter che...

Страница 15: ...same in every string Always connect an even number of strings String 1 TA and string 2 TB or String 1 and string 3 TA string 2 and string 4 TB The inputsTA andTB must be symmetrically wired 1 Furnish...

Страница 16: ...Up to 50 PLATINUM inverters can be connected to a network together with monitoring devices Network cable CAT 5 cable with twisted wires and shielding with prefabricated RJ45 plugs Pin 3 B and Pin 6 A...

Страница 17: ...IN left Outgoing cable OUT right 4 Tighten the network screw connections A 1 2 3 4 5 6 IN RS232 OUT B A B 5 Connect the network cables in the inverter CAT 5 cable with RJ45 plug Incoming cable IN soc...

Страница 18: ...at the first and last inverters Terminating ensures that the network functions correctly 9 1 Remove the terminating plug 9 from the service cover 2 Activate termination in the inverter First participa...

Страница 19: ...th each other via the PLATINUM network EIA485 initial operation can be performed on any inverter master programming For this to be possible all inverters in the network must be switched on The inverte...

Страница 20: ...n Initial operation Exchange inverter new configuration Start Start Language Language Network scan Network scan Change device number Exchange inverter Reassign numbers Country code Country code Date D...

Страница 21: ...hose network participants that are correctly connected via the PLATINUM network Change device number reassign numbers During initial operation the inverter numbers are assigned automatically in the ne...

Страница 22: ...ntry required using the buttons and confirm with OK Further settings may be required depending on the country These settings depend on the network operator The country code is automatically applied to...

Страница 23: ...rter 7000 R3 9000 R3 11000 R3 14000 R3 16000 R3 Initial operation Depending on the requirements of the network operator the following additional settings must be made in the service menu see Service m...

Страница 24: ...n buttons 8 ESC button 9 Inverter number 10 Scroll arrows vertical and horizontal 11 Week day The scroll arrows show which navigation buttons can be used to navigate on the current screen Meaning of t...

Страница 25: ...1 and 2 TODAY and ACTUAL operation display buttons Switch between time periods TODAY or between ACTUAL 1 and ACTUAL 2 5 2 2 TODAY operation display TheTODAY operation display is divided between two sc...

Страница 26: ...day and Since initial operation Differing display in other time periods The current power value W is only displayed for theTODAY period and if energy is currently being fed in In all other periods and...

Страница 27: ...the DC side are displayed 5 3 Isolate from generator field DC isolator The DC isolator on the left side of the inverter enables the solar generator to be switched on and off Position 0 Solar generato...

Страница 28: ...he menu selected by choosing OK The associated submenus are displayed 6 1 2 Menu operation The scroll arrows available in the current menu are shown in the black bar on the left Button Meaning Select...

Страница 29: ...s Date time Date format DD MM YYYY MM DD YYYY YYYY MM DD Daylight saving Manually automatically Language Deutsch English Italiano Espa ol Nederlands Fran ais Alarm volume 0 3 LCD Contrast 0 63 Brightn...

Страница 30: ...ving MANUALLY Switch to daylight saving wintertime manually When the date and time are next entered the DAYLIGHT SAVINGYES NO prompt appears AUTOMATICALLY Automatic switch to daylight saving wintertim...

Страница 31: ...System Name Assign the system network with several inverters one name max 18 characters Description Specify the system further by means of a description max 18 characters Plant size Power system Enter...

Страница 32: ...n date and number of operating hours 2 Energy since the last reset and number of operating hours 3 4 3 Name and description if available of the system 4 Number of participants and inverters in the PLA...

Страница 33: ...ce initial operation New configuration See section 4 3 MPP mode See section 6 5 4 Grid support See section 6 5 5 Power reduction See section 6 5 6 The country code can only be changed four hours after...

Страница 34: ...007 1 Parameter 1007 with submenus 1007 0 and 1007 0 0 with the current value for 1007 0 0 6 5 4 MPP Mode service menu MPP mode Default Default MPP mode for free module surface Shadow mode For systems...

Страница 35: ...ted Phi Associated angle Reactive power Enter the reactive power P_Nom 0 50 Type Capacitive over excited inductive under excited Reactive power Associated reactive power Cosine Phi P In this setting c...

Страница 36: ...formed only by trained specialist personnel The trained specialist personnel must be granted permission by the energy provider responsible Before every maintenance or cleaning task f f Switch off main...

Страница 37: ...nt list can be called up by pressing the button see Page 39 8 1 1 Serious errors WARNING Destruction of the inverter due to serious error f f Switch off AC voltage f f Switch off DC voltage set the DC...

Страница 38: ...3 To exit the error display press the button The event list is displayed 4 Exit the event list by pressing the ESC button The initial operation screen is displayed The red LED continues to flash as lo...

Страница 39: ...cs When making contact with the PLATINUM service have the serial number and event code to hand To exit the event list press the ESC button No Meaning Measure Serious errors 900 AC voltage too high Iso...

Страница 40: ...nnection on AC plug 1310 1990 System error Isolate inverter from network Put inverter back into operation If measures prove unsuccessful Inform service Non blocking errors 2010 Amplitude limit for fee...

Страница 41: ...Diagnosis support in service situation Inform service of error code if required 2900 Subsequent error during network fault or excess temperature No measures required 2910 2990 Diagnosis support in se...

Страница 42: ...t variables 7000 R3 Rated AC power cos 1 6 000 W Rated AC current intensity 8 7 A Max apparent power 6 000 VA Max AC current intensity 11 2 A Max short circuit current 117 4 A Switch on current 1 54 A...

Страница 43: ...2 x 24 A 2 x 2 1 18 A 22 A 29 A 33 A Isolation check 9000 R3 11000 R3 14000 R3 16000 R3 8 000 W 10 000 W 13 000 W 15 000 W 11 6 A 14 5 A 18 9 A 22 0 A 8 000 VA 10 000 VA 13 000 VA 15 000 VA 14 8 A 18...

Страница 44: ...Max temperature for rated power 45 C Storage temperature 25 C to 80 C Max humidity 95 Protection class IP65 in accordance with DIN EN 60529 Contamination level II external and internal use possible I...

Страница 45: ...mission by the energy provider responsible f f Switch off mains voltage supply safety device f f Set the switch knob of the DC isolator to 0 f f Wait at least 5 minutes until the capacitors are discha...

Страница 46: ...replaced parts are to be disposed of in accordance with the regulations of the country in which the inverter was installed Do not dispose of PLATINUM inverters in household waste Diehl Controls takes...

Страница 47: ...47 Installation and user guide PLATINUM Inverter 7000 R3 9000 R3 11000 R3 14000 R3 16000 R3...

Страница 48: ...nerstra e 75 88239 Wangen im Allg u Germany Tel 49 7522 73 700 Fax 49 7522 73 710 platinum diehl controls com www diehl com photovoltaics PLATINUM Service Tel 49 7522 73 777 Fax 49 7522 73 737 service...

Отзывы: