- 2 -
The manufacturer, assembler, and importer are responsible for the safety,
reliability and performance of the unit only if:
-
Installation, calibration, modification and repairs are carried out by
qualified authorized personnel.
-
Electrical installations are carried out according to the appropriate
requirements such as IEC364.
-
Equipment is used according to the operating instructions
Planmeca pursues a policy of continual product development. Although every
effort is made to produce up-to-date product documentation this publication
should not be regarded as an infallible guide to current specifications. We
reserve the right to make changes without prior notice.
COPYRIGHT PLANMECA USA 2008-05
PUBLICATION Revision 5 JO
Содержание Proline XC Pan
Страница 1: ...PLANMECA Proline XC Pan Calibration Manual ...
Страница 4: ... 4 ...
Страница 6: ... 6 ...
Страница 14: ... 14 ...
Страница 20: ... 20 ...
Страница 36: ... 36 ...
Страница 38: ... 38 Press Service Settings Figure 56 Figure 56 Press Patient Positioning Adjustment Figure 57 Figure 57 ...
Страница 42: ... 42 www planmecausa com ...