User’s Manual of WGR-500-4P and WGR-500-4PV
24
Step 2
: Lightly insert the DIN-rail bracket into the track as shown in
Figure 2-16
.
Figure 2-16:
Router is placed on the track
Step 3
: Router is placed on the track as shown in
Figure 2-17
Figure 2-17:
Router is tightly fixed on the track