User’s Manual of WGR-500-4P and WGR-500-4PV
21
2.2 Installing the industrial wall-mount Gigabit router
This section describes how to install your industrial wall-mount Gigabit router and make connections. Please read
the following sections and perform the procedures in the order being presented.
2.2.1 Wall-mount Installation
To install the industrial wall-mount Gigabit router on the wall, simply follow the following steps:
Step 1:
There are 4 holes with 8mm diameter on the wall mount bracket of the Industrial wall-mount Gigabit router
as shown in
Figure 2-11
. The distance between the 2 holes is 165mm of WGR-500-4PV and WGR-500-4P
and the line through them must be horizontal.
Figure 2-11:
Getting Mounting Holes Aligned