
Operation • 2
2-21
SV61656 Rev. A
Testing the Job
Load material and press
Trial Piece
so that you can check if the
setup is correct.
You can make minor changes to the job settings at this stage if the
trial piece needs fine tuning. Press
Setup
, then use the
Prev
(◄),
Next
(►) and
Change
(
+/-
) buttons as required to modify job set
-
tings. The chart below will help you fine tune your fold settings.
FOLD TYPE
ADDRESS TOO LOW
ADDRESS TOO HIGH
C - Letter Fold
Decrease Fold A
Increase Fold A and
increase Fold B by
the same amount
Z - Accordion
Increase Fold A
Decrease Fold A a
Fold
increase Fold B by
the same amount
Single Fold
Increase Fold A
Decrease Fold A
Double Fold
Decrease Fold A
Increase Fold A
We suggest that you change folds by 0.20 inches (5mm) each time
and run a new trial piece run to test the settings.
When you’ve made the necessary changes, press
Setup
again to
return to run mode. The machine will save the job with the new set
-
tings.
Содержание DI380 OfficeRight
Страница 1: ...OfficeRight Document Inserting System DI380 Operator Guide US Canada English Version ...
Страница 6: ...Table of Contents iv SV61656 Rev A ...
Страница 12: ...1 Introduction 1 6 SV61656 Rev A Machine Identification Continued 5 3 6 4 7 8 9 10 11 12 ...
Страница 58: ...3 OMR 3 20 SV61656 Rev A ...
Страница 76: ...4 Reference 4 18 SV61656 Rev A ...
Страница 78: ...JOBS SV61656 Rev A 5 2 Job Description 10 11 12 13 14 15 16 17 18 19 20 ...
Страница 90: ...Appendix A Glossary SV61656 Rev A A 12 ...
Страница 99: ......