10
27. VERY IMPORTANT: DO NOT ANCHOR COLUMNS TO THE FLOOR WITH BOLTS OR WITH FASTENING
ELEMENTS. The warranty will be void when anchoring down the pool.
c. Put a top plate T2 (4) (ref. 571) onto the top edge of the pool wall and the vertical profile (VER) with the tabs
inside the profile, fig. 28.
d. Align the holes for the TO2 (6) screws (fig. 28) to the three holes of the vertical profile, making sure to fasten
the holes in the tabs on the T2 plate (6).
e. Repeat steps a, b, c, d for the rest of the profiles around the pool
.
fig.27
fig.28
INSTALLATION OF THE TOP PROFILES (HOR)
a) Place a top profile (fig.29-30) with one end on top of the top plate. The
side of the top profile facing the centre of the pool should be close to
the pool liner and the pool wall. The side of the top profile facing the
outside of the pool will form a large overhang.
b) Line up the holes as shown. Fasten through the two oval holes to the
top plate below with two screws (fig.26). Do not tighten the screws yet.
Leave the screws slightly loose until all the top profiles are in place.
c) Repeat the last two steps for the other end of the top profiles. Repeat
previous steps to install the rest of the top profiles around the top of
the pool wall. Make the pool settle into a perfect circle by pushing the
top of the pool wall vigorously inward at each vertical profile (this will
help make the bottom of the pool wall shift into a perfect circle).
d) Adjust all the top profiles until they are lined up evenly with each other
and tighten all the screws, fig. 31.
fig.29
fig.30
fig.31
INSTALLATION OF THE TOP CONNECTORS (EMB)
Line up a one-piece top connector onto the ends of two top profiles. Hook the top connector under the inside
edges of the top profiles (photo 1, 2, 3). Bring the top connector down into place and pull out the front tabs to
fasten it under the outside edges of the top profiles. Repeat the three steps for the rest of the top connectors.
photo 1 photo 2 photo 3