
6.7 Re-installation while the outdoor unit
needs to be repaired
1. Evacuating the entire system
Procedure:
1). Confirm that both the 2-way and 3-way valves
are set to fully opened position.
2). Connect the vacuum pump to 3-way
valve’s service port.
3). Evacuate for approximately one hour.
Confirm that the low side pressure gauge
indicates
-0.1Mpa (14.5 Psi).
4). Close the valve (Low side) on the
charging set, turn off the vacuum pump
and confirm that the gauge needle does
not move (within approximately 15 minutes
after turning off the vacuum pump).
5). Disconnect the charging hose from the
vacuum pump.
2. Refrigerant charging
Procedure:
1). Connect the charging hose to the
charging cylinder, open the 2-way valve
and the 3-way valves.
Connect the charging hose which you
disconnected from the vacuum pump to the valve
at the bottom of the cylinder. If the refrigerant is
R410A, set the cylinder upside down to ensure
liquid charge.
2). Purge the air from the charging hose.
Open the valve at the bottom of the cylinder and
press the check valve on the charge set to purge
the air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto an electronic
scale and record the weight.
4). Open the valve (Low side) on the charge
set and charge the system with liquid
refrigerant
If the system cannot be charged fully with the
specified amount of refrigerant, or can only
be charged with little amount at a time,
(approx. 150g (5 Ozs) each time), while
operating the air conditioner in the cooling
cycle, wait approx. 1 minute and then
repeat the procedure.
5).When the electronic scale displays the
proper weight, disconnect the charge hose
from the 3-way valve’s service port
immediately
If the system has been charged with liquid
refrigerant while operating the air conditioner, turn
off the air conditioner before disconnecting the
hose.
6). Mount the valve stem caps and the
service port cap. Use torque wrench to
tighten the
service port cap to a torque of 18N.m. Be
sure
to check for gas leakages.
Содержание YN018GMFI16M2D
Страница 19: ...7 Wiring Diagrams 8 1 Wiring diagram of DUAL Circuit outdoor unit YN018GMFI16M2D ...
Страница 20: ...PCB board of YN018GMFI16M2D ...
Страница 21: ...IPM board of YN018GMFI16M2D ...
Страница 22: ...8 2 Wiring diagram of Triple Circuit outdoor unit YN027GMFI16M3D YN030GMF16M3D ...
Страница 23: ...PCB board of YN030GMFI16M3D ...
Страница 24: ...IPM board of YN030GMFI16M3D ...
Страница 25: ...PCB board of YN027GMFI16M3D ...
Страница 26: ...IPM board of YN027GMFI16M3D ...
Страница 27: ...8 3 Wiring diagram of Quadruple 4 zone outdoor unit YN036GMFI16M4D ...
Страница 28: ...PCB board of YN036GMFI16M4D ...
Страница 29: ...IPM board of YN036GMFI16M4D ...
Страница 30: ...PFC board of YN036GMFI16M4D ...
Страница 46: ......
Страница 48: ...9 4 1 7 Over voltage or too low voltage protection diagnosis and solution ...
Страница 60: ...IPM for dual tri zone IPM for quad zone P N for dual tri zone ...
Страница 61: ...P N for quad zone ...
Страница 62: ...bridge rectifier for dual tri zone bridge rectifier for quad zone ...
Страница 63: ...Remark Measure the DC voltage between and port The normal value should be 190V 250V ...
Страница 65: ...Two ports of the inductance Inductance ...
Страница 66: ......
Страница 71: ......
Страница 73: ......
Страница 75: ......
Страница 77: ......
Страница 89: ...6 EXV check Disconnect the connectors ...
Страница 91: ...Red Blue Red Yellow ...
Страница 92: ...Brown Orange Brown White ...
Страница 108: ...Screws of front panel Screws of right rear panel Screws of top cover ...
Страница 116: ...Screws of big handle Screws of right rear panel Screws of water collector Screws of terminal board ...
Страница 122: ...10 Exploded Views Available under a separate document file ...