CDJ-1000MK2
78
1
2
3
4
1
2
3
4
C
D
F
A
B
E
SW Ring
Roller A Assy
Roller A Assy
×
9
Roller A Assy
1
1
1
3
5
1
Sheet SW
SW Cushion HH48
×
12
JOG Holder 2
JOG Holder 2
Roller A Assy
×
9
Caution in Sheet SW Installation
1
Be careful not to bend and fold the Sheet SW.
2
Confirm that the dust or trash does not adhere to pasting side
(JOG Holder).
In addition, when tearing off the former Sheet SW and putting
a new part, completely wipe the JOG Holder off with alcohol
so that paste does not remain on the pasting side of
JOG Holder.
3
When putting the Sheet SW, match the position not to run
aground on rib of the internal circumference of JOG Holder.
4
Sheet SW pushes all the sides including the point of contact
fully, and put it. (No good air getting into it.)
(When the air got into it, remove it and replace the new one.
Do not recycle it.)
5
Put the SW Cushion HH48 on direction arrow part (12 places)
of the Sheet SW.
6
When inserting a cable in connector, release a lock by all
means, and connector locks after inserting it.
Caution in Roller A Assy Installation
1
Apply a grease (GYA1001) to the shaft bearing section of
JOG Holder side and SW Ring side.
(Apply it to two places for roller one.)
(Be careful so that grease does not adhere to rubber section
of the roller.)
Grease: GYA1001 (ZLB-PN397B)
Grease: GYA1001 (ZLB-PN397B)
Grease: GYA1001 (ZLB-PN397B)
Grease: GYA1001 (ZLB-PN397B)