CDJ-1000MK2
5
5
6
7
8
5
6
7
8
C
D
F
A
B
E
CONTENTS
1. SPECIFICATIONS .............................................................................................................................................6
2. EXPLODED VIEWS AND PARTS LIST.............................................................................................................7
2.1 PACKING ....................................................................................................................................................7
2.2 EXTERIOR SECTION (1/2) ........................................................................................................................8
2.3 EXTERIOR SECTION (2/2) ......................................................................................................................10
2.4 SLOT-IN MECHANISM SECTION ............................................................................................................12
2.5 TRAVERSE MECHANISM ASSY-S ..........................................................................................................13
3. BLOCK DIAGRAM AND SCHEMATIC DIAGRAM ..........................................................................................14
3.1 BLOCK DIAGRAM ....................................................................................................................................14
3.2 OVERALL WIRING DIAGRAM .................................................................................................................16
3.3 MAIN (1/4) and SPCN ASSYS .................................................................................................................18
3.4 MAIN (2/4), FLRB and SLMB ASSYS ......................................................................................................20
3.5 MAIN (3/4) and MMCB ASSYS ................................................................................................................22
3.6 MAIN ASSY (4/4)......................................................................................................................................24
3.7 DABB, JACB and DOUT ASSYS ..............................................................................................................26
3.8 MFLB (1/2) and RSWB ASSYS ................................................................................................................28
3.9 MFLB (2/2) ASSY .....................................................................................................................................30
3.10 KSWB and SLDB ASSYS.......................................................................................................................31
3.11 JFLB and JOGB ASSYS.........................................................................................................................32
3.12 SW POWER SUPPLY and PSWB ASSYS .............................................................................................34
4. PCB CONNECTION DIAGRAM ......................................................................................................................42
4.1 MAIN ASSY ..............................................................................................................................................42
4.2 SPCN, STCN, FLRB, SLMB and MMCB ASSYS .....................................................................................46
4.3 DABB, JACB and DOUT ASSYS ..............................................................................................................48
4.4 MFLB and RSWB ASSYS ........................................................................................................................50
4.5 KSWB ASSY.............................................................................................................................................54
4.6 SLDB ASSY..............................................................................................................................................55
4.7 JFLB and JOGB ASSYS...........................................................................................................................56
4.8 SW POWER SUPPLY and PSWB ASSYS ...............................................................................................58
5. PCB PARTS LIST ............................................................................................................................................59
6. ADJUSTMENT ................................................................................................................................................64
7. GENERAL INFORMATION .............................................................................................................................65
7.1 DIAGNOSIS ..............................................................................................................................................65
7.1.1 SERVICE MODE ................................................................................................................................65
7.1.2 DISASSEMBLY ..................................................................................................................................75
7.1.3 On Discharge of the Capacitor ...........................................................................................................80
7.1.4 CLEANING .........................................................................................................................................80
7.1.5 POWER ON SEQUENCE ..................................................................................................................81
7.2 PARTS ......................................................................................................................................................84
7.2.1 IC........................................................................................................................................................84
8. PANEL FACILITIES .........................................................................................................................................93