Installation example:
The full face of the safety switch is installed on the subplate.
As a result, the edges of the safety switch base are protected from shock.
Periodic test
}
Make sure that the work is
not
performed in an explosive atmosphere.
}
Carry out a monthly function test on the safety switch and actuator.
}
Always test the function with the PSEN i1 interface and connected evaluation device.
}
The safety function may only be checked by qualified personnel.
}
Refer to the notes on checking the safety switch in EN 60079‑17 and EN 60079‑19.
NOTICE
The safety function should be checked after initial commissioning and each
time the plant/machine is changed. The safety functions may only be
checked by qualified personnel.