background image

PSEN 2.1p-24

Operating Manual PSEN 2.1p-24
21100-EN-13

| 11

The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Make sure that the connection is made in accordance
with the specifications in the operating manual for the selected evaluation device.

Defined properties of evaluation devices:

}

2-channel with feasibility monitoring

}

Open circuit monitoring of the safety switch is performed

}

Inputs and outputs on the evaluation device must fulfil the requirements of IEC 61131,
Type 3

}

Technical data of the evaluation device must fulfil the requirements in the 

Technical

details [

 17]

 of PSEN 2.1p-24, ATEX

– Always comply with the max. switching current safety contacts of PSEN 2.1p-24,

ATEX.

}

Outputs at the evaluation device must only be switched on again when both reed con-
tacts at the safety switch have been opened and closed (partial operation lock)

INFORMATION
Risk time in accordance with DIN EN 60947-5-3

The risk time is made up of the reaction time of the sensor (see 

Technical

details [

 17]

) and the processing and delay times of the evaluation

device (s. operating manual for the relevant evaluation device).

Evaluation device

Input circuit

Input circuit

Non-Ex area

Ex area

PSENmag

3

1

2

4

Fig.: Dual-channel connection PSEN 2.1p-24, ATEX to the input circuits of an evaluation device

Содержание PSEN 2.1p-24

Страница 1: ...PSEN 2 1p 24 Operating Manual 21100 EN 13 PSEN sensor technology...

Страница 2: ...nta tion will be gratefully received Source code from third party manufacturers or open source software has been used for some components The relevant licence information is available on the Internet...

Страница 3: ...6 Disposal 6 For your safety 7 Unit features 7 Function description 8 Block diagram 8 Operating distances 8 Lateral and vertical offset 9 Wiring 9 Pin assignment 10 Requirements and connection to eva...

Страница 4: ...articularly important is identified as follows DANGER This warning must be heeded It warns of a hazardous situation that poses an immediate threat of serious injury and death and indicates preventive...

Страница 5: ...cordance with EN 60947 5 3 PDDB only in connection with the operator PSEN 2 1 20 and the suitable evaluation devices see Requirements and connection to evaluation devices 10 The following is deemed im...

Страница 6: ...evices systems and machines the person has to be informed of the state of the art and the applicable national European and international laws directives and standards It is the company s responsibilit...

Страница 7: ...bout to connect the unit This will prevent potential contamination The connector should be protected from accidental loosening e g using a cable tie WARNING Ignition spark from cable separator connect...

Страница 8: ...with the following components Actuator PSEN 2 1 20 see Order reference 19 and a connected evaluation device see Requirements and connection to evaluation devices 10 Block diagram Actuator Safety swit...

Страница 9: ...ngth lmax Rlmax Ri Rl km Imax Rlmax Max overall cable resistance see evaluation device s technical details Ri Internal resistance sensor see Technical details 17 Rl km Cable resistance km of the cable...

Страница 10: ...own in an unoperated condition Assignment of the 4 pin connector 1 2 3 4 white brown blue black Requirements and connection to evaluation devices For use of PSEN 2 1p 24 ATEX in accordance with DIN EN...

Страница 11: ...valuation device must fulfil the requirements in the Technical details 17 of PSEN 2 1p 24 ATEX Always comply with the max switching current safety contacts of PSEN 2 1p 24 ATEX Outputs at the evaluati...

Страница 12: ...uation devices Non Ex area Ex area I0 I1 PNOZmulti PSENmag 3 1 2 4 T1 T0 3 1 2 4 11 12 13 14 PSEN i1 brown white blue black Legend I0 Input OSSD I1 Input OSSD T1 T2 Test pulse outputs Non Ex area Ex a...

Страница 13: ...ts made of non magnetic material e g brass or stainless steel Avoid the risk of damages from foreseeable external influences by attaching the safety switch and actuator If necessary safety switch and...

Страница 14: ...eference Safety switches and actuators should only be secured using M4 screws with a flat head e g M4 cheese head or pan head screws Use screws made of non magnetic material e g brass Adjustment The s...

Страница 15: ...atmosphere Carry out a monthly function test on the safety switch and actuator Always test the function with the PSEN i1 interface and connected evaluation device The safety function may only be chec...

Страница 16: ...PSEN 2 1p 24 Operating Manual PSEN 2 1p 24 21100 EN 13 16 Dimensions in mm 13 6 5 13 8 5 36 22 6 8 4 5 26 10 6 M8x1 8 5 4 5 36 22 26 19 19...

Страница 17: ...nt safety contacts 10 mA Max breaking capacity safety contacts 0 3 W Max permitted total power dissipation 170 mW Times Reaction time actuator removed 2 ms Environmental data ATEX certification SEV 12...

Страница 18: ...0947 5 2 Yes follow installation guidelines Connection type M8 4 pin male connector Material Top PC Max torque setting Safety switch 1 Nm Actuator 1 1 Nm Dimensions Height 45 mm Width 26 mm Depth 13 m...

Страница 19: ...ade cable straightplug2m Female connector M8 straight 4 pin 2 m 533 111 PSEN Kabel Winkel cable angleplug 5m Female connector M8 angled 4 pin 5 m 533 120 PSEN Kabel Gerade cable straightplug 5m Female...

Страница 20: ...00 Series connection Product type Features Order no PSEN i1 Interface for 4 PSEN 2 Interface PSEN i1 for connecting and evaluating several safety switches PSEN ma 535 110 PDP67 F 8DI ION Decentralised...

Страница 21: ...fetyNET p THE SPIRIT OF SAFETY are registered and protected trademarks of Pilz GmbH Co KG in some countries We would point out that product features may vary from the details stated in this document d...

Отзывы: