Step
Action
1
Press and hold the button of the bypass valve HP2/2 (7.1) to:
• bring the upstream pressure to the power supply unit of the LINE-OFF 2.0 device;
• balance the pressure of the HB/97 built-in slam-shut valve plug.
2
Release the button of bypass valve HP2/2 (7.1) after checking that the upstream and downstream pressure
of the slam-shut valve is balanced.
3
Turn the adjusting screw of the R44/SS regulator (7.5) clockwise and tighten it until reaching the tripping value
(6 bar) of the safety valve VS/FI (7.6).
NOTICE!
Check the pressure, referring to the pressure gauge (7.3) connected to the R44/SS regulator.
4
If the safety valve VS/FI (7.6):
• opens before the expected pressure value, unscrew the locking ring nut and tighten (clockwise) the adjust-
ment plug so that the spring inside it is further compressed;
• does not open at the expected pressure value, unscrew the locking ring nut and loosen the adjustment
plug anti-clockwise, so as to release the spring inside.
5
Check the VS/FI valve (7.6) for correct calibration:
• decreasing the pressure by adjusting the adjusting screw of the R44/SS regulator (7.5);
• increasing the pressure until the VS/FI valve (7.6) trips by turning the adjusting screw of the R44/SS reg-
ulator (7.5).
6
Repeat step 5 at least three times to properly calibrate the VS/FI safety valve (7.6).
7
By turning the adjusting screw, calibrate the R44/SS regulator (7.5) to the required pressure value (min. 4 bar,
max. 5 bar) referring to the connected pressure gauge (7.3), then:
• if the pressure value on the pressure gauge is lower than the set value of the R44/SS regulator (7.5): tight-
en the adjusting screw clockwise so as to further compress the spring inside it;
• if the pressure value on the pressure gauge is higher than the calibration value of the R44/SS regulator
(7.5): unscrew the adjusting screw anti-clockwise so as to further release the spring inside.
8
Press the button of bypass valve HP2/2 (7.1) and check that the upstream and downstream pressure is bal-
anced.
9
Release the HP2/2 bypass valve button (7.1).
10
Reset the HB/97 slam-shut valve by operating the lever (7.9).
Tab. 8.83.
COMMISSIONING THE REGULATOR
NOTICE!
Refer to paragraph 8.5 “Regulator commissioning procedure” in this chapter.
8.12 - CALIBRATION OF THE PRESSURE SWITCH FOR LINE OFF 2.0
NOTICE!
For the pressure switch calibration procedure, please refer to paragraph 8.10.2 'Calibration procedure for
pressure switches mod. 100’.
Содержание REVAL 182
Страница 2: ...2 REVAL 182 EN Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR INTRODUCTION REV 00 ...
Страница 4: ...4 REVAL 182 EN Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR INTRODUCTION REV 00 ...
Страница 12: ...12 REVAL 182 EN Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR INTRODUCTION REV 00 ...
Страница 22: ...22 REVAL 182 EN Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR GENERAL INFORMATION REV 00 ...
Страница 32: ...32 REVAL 182 EN Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR SAFETY REV 00 ...
Страница 107: ...107 REVAL 182 Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR COMMISSIONING REV 00 EN ...
Страница 111: ...111 REVAL 182 Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR COMMISSIONING REV 00 EN ...
Страница 115: ...115 REVAL 182 Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR COMMISSIONING REV 00 EN ...
Страница 398: ...398 REVAL 182 EN Use maintenance and warning instructions MEDIUM PRESSURE REGULATOR RECOMMENDED SPARE PARTS REV 00 ...
Страница 404: ......