5 Installation
22
Version: 1.3.0
MP136E
U651 Rotation Stage
5.5
Connecting the Vacuum Version to the Controller
It is necessary to install a vacuum feedthrough (p. 10) for the vacuum version of the U-651.
Requirements
You have read and understood the general notes on installation (p. 15).
The controller is
switched off
.
You have connected the U-651 to the protective earth conductor (p. 17).
You have read and understood the C815T0003 technical note for the C-815.VF vacuum
feedthrough.
Tools and accessories
C-815.VF vacuum feedthrough, D-sub 15 (p. 10)
PILine® U-600.A0x (p. 10) extension cable, D-sub 15, 1 m to 5 m, air side
Suitable tools for installing the vacuum feedthrough
Installing the vacuum feedthrough
1.
Refer to the C815T0003 technical note for the vacuum feedthrough dimensions (see
"shell size 2").
2.
Provide a suitable opening in the vacuum chamber.
3.
Install the vacuum feedthrough so that the D-sub 15 (f) socket is in the vacuum
chamber.
Connecting the vacuum version to the controller
Connect the U-651 ("positioner"), vacuum feedthrough, and controller as shown in the
connection diagram below.
−
Pay attention to the assignment specified on the labeling of the sockets, plug
connectors, and cables.
Figure 8: Connection of the vacuum version to the controller