Appendix: E
42
Lifting Appliance
Project
Item
Spec
Quantity
Application
Remarks
Nylon Slings
2T, 6M
2
Lifting the
Spanners
Project
Item
Spec
Quantity
Application
Remarks
Offset Ring Spanners
16#/18#
16#: 1pcs
Tail rudder plate
/
Adjustable Spanners
12 inches
2
Connecting the
generator with the
tower
/
Torque Spanners
Sockets 16# / 18#/ 24#
16#:1pcs
18#:1pcs
24#:1pcs
blades
/
Allen Wrenches
6# 8#
2
Cowls, tail cover
/
Other Tools
Project
Item
Spec
Quantity
Application
Remarks
Crow Bars
φ25 length: 1m
1
the installation of
Tower
/
Hammers
8 pounds
1
the installation of
Tower
/
Rubber Hammers
8pounds
1
Tail rudder plate
/
Wind Driven Generator Assembly Tools
Measuring Tool
Project
Item
Spec
Quantity
Application
Remarks
Multimeters
Universal
1
Check after installation
/
Tape Measures
10m
1
Measuring the distance
of the blade tips
/
Infrared Levels
/
1
Measuring the
verticality of the towers
/
Содержание Phono W-1.0
Страница 1: ...OWNER S MANUAL Installation Operation Maintenance...
Страница 19: ...15 Installation Flow Chart...
Страница 24: ...20 Step 1 Step 2 Step 3 B A A A...
Страница 25: ...21 Step 4 Step 5 Step 6 Overturn Overturn...
Страница 26: ...22 L1 L2 L3 L1 L2 L3 3mm...
Страница 29: ...25 Connections of Tail Rudder and Generator Step 1 Step 2 Step 4 Step 3...