28
Off-grid System Connections
1) When connecting the wires, do it according to the order from right to left.
2) When connecting the wires, make the Wind Turbine be in the status of “stop” and the Battery On-
off is in that of “Off”.
3) Please refer to Appendix C for the inverter and battey’s allocations or contact Phono Wind.
4) Please refer to Appendix D for the cable’s specifications.
Controller
Inverter
Grid
AC
DC
AC
DC load
DC
Battery Bank
DC
A B C
Wind Input
Inverter
+
-
Battery
+
-
Dump load
+
-
GND
Wind Turbine
STOP
Normal
Read
Brake
Brake
Normal
Battery
On
Off
〓
┻
R
Battery
G
Wind Turbine
DC>AC
Off-gird
Inverter
AC LOAD
Содержание Phono W-1.0
Страница 1: ...OWNER S MANUAL Installation Operation Maintenance...
Страница 19: ...15 Installation Flow Chart...
Страница 24: ...20 Step 1 Step 2 Step 3 B A A A...
Страница 25: ...21 Step 4 Step 5 Step 6 Overturn Overturn...
Страница 26: ...22 L1 L2 L3 L1 L2 L3 3mm...
Страница 29: ...25 Connections of Tail Rudder and Generator Step 1 Step 2 Step 4 Step 3...