3
Set-up and function
3.1 Overview
Fig. 3: Overview of assembly workstation with optional modules (examples)
A Assembly workstation with two-stage Multilift II
lifting column
B Assembly workstation with three-stage Multilift II
lifting column
1
)
2
Pivoting material rail (1 rail,
)
3
)
4
Balancer (
)
5
Runner profile with carriage (
6
Portal (
)
7
8
Pivoting material rail (3 rails,
)
9
Drawer cabinet (
10 Multilift II Standard/ESD/impact lifting column
)
)
14 LED lamp (
)
15 Monitor mounting (
16 PC holder (
)
17 Multilift II impact telescope lifting column
Assembly workstation with opti-
onal modules
Set-up and function
Overview
29.05.2019
Assembly workstation RK Easywork
78
Содержание RK Rose+Krieger Easywork
Страница 55: ...Anhang Anhang 29 05 2019 Montagearbeitsplatz RK Easywork 55...
Страница 56: ...Anhang 29 05 2019 Montagearbeitsplatz RK Easywork 56...
Страница 58: ...Konformit tserkl rung 29 05 2019 Montagearbeitsplatz RK Easywork 58...
Страница 110: ...Appendix Appendix 29 05 2019 Assembly workstation RK Easywork 110...
Страница 112: ...Declaration of conformity 29 05 2019 Assembly workstation RK Easywork 112...